Design-Build & CM/GC
One team from concept through commissioning.
Delivery-method projects succeed when the contractor is at the table while decisions are still open. We bring estimating, constructability, scheduling and field leadership into design, and we keep the cost model open so the owner can make trade-offs with real numbers.
Scope of work
- Preconstruction and constructability review
- Target-value design and open-book estimating
- Permitting and agency coordination
- Early works and long-lead procurement
- Guaranteed maximum price development
- Integrated commissioning and closeout
Technical capabilities
- Progressive Design-Build
- Design-Build
- CM/GC and CM at Risk
- Interactive estimating and risk registers
- Schedule and cost model integration
- Owner reporting and decision logs
The cost model is a design tool
In a delivery-method project, the estimate is not a number submitted at the end; it is a live model that tells the owner what a decision costs. We price alternates during design, identify the long-lead items that control the schedule, and show the risk behind each allowance.
Constructability before commitment
Our superintendent and trade partners review the drawings while they can still change. We look for access, crane reach, formwork repetition, tie-in sequence and the temporary conditions that drawings often leave to the field. The result is a design that can be built with the crews and equipment available.
One schedule, one team
Design, permitting, procurement and construction are tracked on a single schedule with named owners for every activity. Owner decisions are logged and dated so the project can move without waiting for meeting minutes to become action.
Commissioning is designed, not improvised
For water and wastewater projects, we define the commissioning sequence during design and carry it through the schedule to substantial completion. The owner’s operators are part of the team from the first workshop.
Design-Build & CM/GC in the field.
How does a contractor get on the Craneway Civil Construction bid list?
What is Craneway Civil Construction’s bonding capacity?
Do you self-perform concrete, earthwork and pipeline work?
How do you handle traffic control and public impact?
What delivery methods do you offer?